Scaffolding Up, Core Drilling StartsThe erection of the basic scaffolding has now been completed on the outside corners of the mill and along the interior of the three walls being stabilized. This has allowed the drilling process to commence, the precursor to the insertion of stainless steel anchor rods, mesh and mortar.Corner Scaffolding on Exterior
View of Interior Scaffolding Anchors will be placed horizontally at the corners, hence the current drilling is being done at those locations in a horizontal plane with temporary PVC pipe inserted. In the area of the windows the anchors will be inserted vertically into timbers placed across the openings. The portions of the full wall receiving stabilization will have anchors inserted vertically along the full length of the wall.
Technician Drilling into Southeast Corner
Temporary PVC Pipe Insert at Drilled Core Hole The Cintec site manager overseeing the work, Daryl Davis, projects that the work will be completed in the mid-July time frame. Dennis Van Derlaske |